/

civil engineer

Forum Replies Created

Viewing 5 posts - 1 through 5 (of 5 total)
  • Author
    Posts
  • #1620
    civil engineer
    Participant

    I would recommend the Autodesk Certification program. It has a course curriculum for a few months and then you have to take up a series of tests to get certified in a particular field, which in your case is planning. Personally I wouldn’t recommend just sticking to planning and would ask you to improvise your skills in elevation designs and 3d interior modelling using software such as Autodesk Revit, Autodesk 3ds Max. This is because the competition is heavy and a multiple skill set gives you a added advantage and to the one that wants to employ you. Also the autodesk certification gives your resume a significant boost when you apply to firms of higher reputation and those that function abroad.

    #1615
    civil engineer
    Participant

    3D printing is poised to have a dramatic impact upon architecture, building design and manufacturing, with entire houses already produced in China with giant 3D printers. 3D printing allows building designers to experiment with shapes and geometries in design that may not be financially viable with existing building techniques.

    By studying a Civil Engineering degree you will learn how engineers approach industrial problems and how 3D printing can improve upon existing solutions.

    #1610
    civil engineer
    Participant

    1.Buildzup Construction Company:
    2.Habib Construction Services:
    3.Izhar Construction:
    4.Habib Rafiq (Pvt) Limited:
    5.Paragon Construction (Pvt) Limited:
    6.Waquat Builders & Developers:
    7.MIDJAC Construction (Pvt) Limited:
    8.Shan Construction Company:
    9.Adam Ismail Construction Company:
    10.Sparco Construction Company:
    These are the top building construction companies of Pakistan

    #1609
    civil engineer
    Participant

    Domestic roller shutters. Installing a set of quality and durable domestic roller shutters is a wondrous way of increasing the security of one’s property. They protect the windows and the doors from the acts of vandalism and burglaries.

    #1607
    civil engineer
    Participant

    LP-1: Low-Level Passive Protection
    • Select systems to minimize normal exposure.
    ◦ Dilute indoor air and reduce recirculation.
    ◦ Minimize leakage in HVAC system and in building (external and internal).
    ◦ Add filtering as needed for healthy workplace.
    ◦ Protect air intakes to reduce air contaminants.
    ◦ Use construction methods and materials that reduce chemical exposure.
    • Consider security, site selection, and operational activities that have dual-use advantages for building protection.
    LP-2: High-Level Passive Protection (LP-1 + options specific to protection from biological and chemical threat agents)
    • Use upgraded protection from biological and chemical threat agents compared to LP-1.
    ◦ Upgrade filters (particulate and adsorption) specific for biological and chemical threat agents.
    ◦ Use zoning with graded pressurization (compartmentalized).
    ◦ Provide local air-washing vestibules.
    ◦ Protect air intakes specifically to reduce biological and chemical threats.

Viewing 5 posts - 1 through 5 (of 5 total)